Putting It Up Instead of Taking It Down

Work on the library's repair and restoration project has entered a new phase as crews swiftly apply the new siding. New concrete piers are in place and framing for the front porch and the handicapped ramp has begun. Inside, application of gypsum board over the existing plaster walls continues. Electricians have rewired to accommodate new recessed lighting, the addition of a closed circuit television system, and the switchover of much of the outside wiring to underground conduits. During the next few weeks, work will center on modifications to the present bathroom, installation of the more energy efficient windows, and further work to the front porch. For photos of the building with its new siding in place, please visit